The bridge was rolled into place on SPMTs in less than three hoursBridge 13 on the Stechford to Aston (SAS) rail line was installed on Saturday 7th May 2022. The bridge was assembled offline, with Severfield steelwork, in a compound alongside the existing railway lines....
Easy to work with, Jordan and the team were professional and were easy to communicate with.
Would highly recommend.