The demolition saw two structures collapsed in a controlled manner with the use of “high-speed” explosives. The 50,000-tonne steel framed Boiler House and a 20,000-tonne, 200m tall reinforced concrete chimney were collapsed over a 10 second period, with the “once-in-a-lifetime event” captured by aerial imaging...
Easy to work with, Jordan and the team were professional and were easy to communicate with.
Would highly recommend.